THE FINAL remaining items which once belonged to an historic Darlington manufacturer are up for auction.

Just 300 lots consisting of tooling, machinery, equipment, office supplies and even a letter from a former prime minister are left in an online auction which is selling off the former Cleveland Bridge assets. 

The auction, available to view online, ends at 10am tomorrow. 

It comes after more than two thousand items were auctioned off in November when people were invited to the Yarm Road factory to try before they could buy. 

The demise of the industry powerhouse was laid bare as the site’s main factory was stripped of all machinery save for some equipment, wires and workbenches.

Read more: What went wrong at Darlington Cleveland Bridge

The Northern Echo: A sheet metal folder up for auction. Pictures: SWA sheet metal folder up for auction. Pictures: SW

From machinery worth thousands of pounds to £5 fridges, the auction list for the assets and equipment at Cleveland Bridge's Darlington headquarters made for shocking viewing. 

Now, its final auction includes industry equipment such as a sheet metal folder, bending rolls and welding machinery.

A hand-signed letter dating back to 2002 from the then prime minister Tony Blair is one of the strangest items up for sale this time. The former Sedgefield Labour MP sent the letter as part of Cleveland Bridge's 125th anniversary celebrations. 

The Northern Echo: The letter from the then prime minister Tony Blair The letter from the then prime minister Tony Blair

But once again, decorative office wall art is up for grabs with bidders able to buy a "Japanese Painting of a Peacock" for as little as £21 or "Eleven Various Framed Pictures of Constructions by Cleveland Bridge" at a starting price of £5. 

The Northern Echo: A painting of a peacockA painting of a peacock

The Northern Echo: Various photos of bridges built by Cleveland Bridge Various photos of bridges built by Cleveland Bridge

The Northern Echo:

Cleveland Bridge’s closure was confirmed in September after a global search by a team of administrators from FRP failed to find a buyer willing to take on a £21million mountain of debt and turn the business around.

Official documents filed by the Cleveland Bridge administrators showed that the company's debts totalled more than £21million.

Click here to view the full list of items up for auction. 

Take a look inside the Cleveland Bridge factory ahead of the auction below. 

The Northern Echo:

The Northern Echo:

The Northern Echo:

The Northern Echo:

The Northern Echo:

Keep up to date with all the latest news on our website, or follow us on Facebook, Twitter and Instagram.

You can also follow our dedicated Darlington Facebook page for all the latest in the area by clicking here.

For all the top news updates from right across the region straight to your inbox, sign up to our newsletter here.

Have you got a story for us? Contact our newsdesk on newsdesk@nne.co.uk or contact 01325 505054